NRI Titan 218 Saves Chesapeake Bay Bridge

NRI’s la structural integrity solution, Titan 218, was recently featured in the July issue of Coatings Pro.

When a run away barge crashed into the concrete pilings of the Chesapeake Bay Bridge, badly damaging them, NRI was the solution. The damaged pilings and other environmental factors, including tidal currents and rough wave conditions made using traditional repair methods an extreme challenge. But these factors created the perfect conditions for the use of NRI to strengthen, repair, and restore your concrete and steel infrastructure – on land and under water!