42″ pre-stressed concrete pipe (PCCP) composite repair

NRI’s composites are not limited to metallic pipes. The city of Orlando in Florida had issues with a leaking 42″ pre-stressed concrete pipe (PCCP). Since this was a force main line, it couldn’t be shut down, and the alternative to cut-and-replace was out of the question. Read more below to learn why the best solution was to use NRI’s composite repair systems.