22″ Offshore export riser repair with Thermo-Wrap CF

A 22″ offshore export riser pipeline in Indonesia was experiencing severe external corrosion, which required an immediate repair because of a high failure risk. The corrosion issue was not only on the main line but also extended onto the secure clamp. NRI’s Thermo-Wrap CF/Carbon Fiber system was used to contain this 1500 psi high pressure line. Read more below.